Abel Matutes: change of steel plate in hull

ABEL MATUTES: REPLACEMENT OF STEEL HULL PLATING Replacement of approximately 3,400 kg of steel plating from the vessel’s outer hull, including the internal reinforcement, on both the starboard and port sides. The work was carried out afloat at Cruise Berth No. 3 in the Port of Valencia, between 20 and 30 October 2015.

Bahía de Málaga: repair of impact on bulbous bow and keel area

BAHÍA DE MÁLAGA: REPAIR OF DAMAGE TO THE BULBOUS BOW AND KEEL AREA Repair of the vessel “Bahía de Málaga” in Burriana. A total of 60 tonnes of steel were replaced as a result of the vessel grounding in Dénia. The work consisted of replacing all the steel in the affected keel area, including all […]

Isla de Botafoc: replacement of main engines

ISLA DE BOTAFOC: MAIN ENGINE REPLACEMENT Replacement of 2 complete engine blocks with new crankshafts and reassembly of the two 10,400 HP Pielstick engines on board the vessel “Isla de Botafoc” while afloat in Gandia. To carry out the repair, an opening had to be cut into the side of the vessel to allow the […]

Cristóbal Colón de Ibiza: Main Engine Overhaul

CRISTÓBAL COLÓN DE IBIZA: MAIN ENGINE OVERHAUL The cylinder heads, pistons, connecting rods and cylinder liners of the Deutz D500 main engine of the vessel Cristóbal Colón de Ibiza are completely dismantled for inspection, together with auxiliary components such as pumps, coolers and injectors. Once all the components have been transferred to our workshops, the […]

Cabo de Santa Pola: Construction of an Aluminium Fishing Vessel Prototype

CABO DE SANTA POLA: CONSTRUCTION OF AN ALUMINIUM FISHING VESSEL PROTOTYPE Construction of a SWATH fishing vessel (prototype). Built with an aluminium hull, with an overall length of 22.5 metres and a beam of 5 metres, the vessel is equipped with a propulsion system delivering 1,000 HP. The aluminium blocks were built at TANAVAL’s workshops, […]

Nixe: Evacuation System Fitting

NIXE: EVACUATION SYSTEM INSTALLATION During the scheduled stop in Dénia, the vessel’s evacuation system was installed, together with the liferafts. This required the fabrication of the corresponding structures and their welding to the hull. All welding work and structures were carried out in aluminium.

Noatum: Construction of Steel Structures for Refrigerated Containers

NOATUM: CONSTRUCTION OF STEEL STRUCTURES FOR REFRIGERATED CONTAINERS Design and construction of “Reefer Rack” steel structures for access to, connection and inspection of refrigerated containers located in the stowage area of the Noatum Port Terminal. This steel structure consists of three levels, with a total length of 14,433 mm, a width of 2,453 mm and […]

Castaví Jet: Construction of an Aluminium Ramp Module

CASTAVÍ JET: CONSTRUCTION OF AN ALUMINIUM RAMP MODULE Construction of a 6000 × 2025 mm aluminium module to extend the stern ramp of the vessel “Castavi Jet”. The module was built at TANAVAL’s facilities in Valencia and transported to the catamaran, which was dry-docked at the Cotnsa Shipyard facilities in Huelva. The existing ramp was […]

Boluda Tramontana: New bow construction

BOLUDA TRAMONTANA: CONSTRUCTION OF A NEW BOW Replacement of a block forming part of the forepeak of the tugboat “Boluda Tramontana”. As no construction drawings were available, measurements were taken of the block to be built in order to prepare detailed fabrication drawings for all the elements that make up the structure. Once the drawings […]

Noatum: Construction of Sorting Cabins

NOATUM: CONSTRUCTION OF SORTING CABINS Construction of steel sorting cabins, according to Noatum’s specifications, fully equipped with air conditioning, electrical installations and interior lining.