BAHÍA DE MÁLAGA: REPAIR OF DAMAGE TO THE BULBOUS BOW AND KEEL AREA

Repair of the vessel “Bahía de Málaga” in Burriana.

A total of 60 tonnes of steel were replaced as a result of the vessel grounding in Dénia.

The work consisted of replacing all the steel in the affected keel area, including all the reinforcement of the internal framework.

The steel plating was formed at TANAVAL’s workshops and subsequently welded onto the vessel in Burriana.